Split-core transformer 333mV for energy saving

 

High energy costs, decentralised generation and energy agreements make energy saving a priority. ELEQ offers a variety of measurement solutions.

Changes are accelerating. Where you used to be able to look years ahead, it is now often difficult to plan a year ahead. The ever-increasing demand for energy, problems with the transport network, decentralized generation and the increasing demand for electric transport mean that the network design and (peak) consumption must be adjusted in the short term. In addition, the grid is more polluted by decentralized generation and today’s equipment is more sensitive to this pollution, which can cause disruptions.

Smart automation

Smart energy monitoring offers the solution to optimize energy consumption. Think, for example, of making it possible to read and control energy consumption locally and remotely. To achieve this, ELEQ has developed a complete energy management line with current and voltage transformers.

 

 

Transformers with a 333mV output

Because measurements often have to be done in existing situations, ELEQ has developed both very small current transformers (RM17 and RM27) and split-core transformers (TQ line). This line has now been expanded with products with a low voltage output, such as 333mV. The advantages of a low voltage output are that they are safer and easy to install:

  • The transformer does no longer needs to be short-circuited.
  • There is less cable loss, which means that much longer and thinner cables can be used.
  • Thinners cables offer the opportunity to be manufactured with, for example, RJ plugs.

In short, ELEQ offers the solution for proper measurement in smarter energy monitoring.

 

Explore ELEQ’s split-core current tranformers 333mV:

 

TQ30 333mV
TQ40-C 333mV
TQ50-E 333mV

 

Looking for a compact transformer for smart energy monitoring?

Please contact us at [email protected], by phone at +31 (0) 521 533 333 or at +49 (0) 2273 988 70.

Share this post via

Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Social Image Social Image Social Image

DEZE PAGINA NIET VERWIJDEREN

Deze pagina is voor nieuws, innovatie en de highlights op de homepagina.

Bewerk inhoud: https://www.eleq.com/wp-admin/post.php?post=17891&action=edit&lang=en

Bewerk wel de uitgelichte afbeelding en preview tekst hier.

Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Social Image Social Image Social Image

ELEQ 333 mV Transformers for smart station automation

The energy market is constantly in motion. Where grid operators used to plan changes for the long-term, the energy transition is forcing a rapid redesign of the grid. An example of this is the uptake of solar panels in certain districts, which affects the required grid capacity. The grid is also becoming destabilised by decentralised generation, and modern equipment is more sensitive to that instability, which can cause disturbances.

Smart station automation

Smarter station automation offers a solution for monitoring grid performance properly. For example, this could include options for local and remote reading and station control. Relevant data to monitor include current, voltage, power, temperature and humidity, short-circuit and overload. When unusual activity is detected, the station can be remotely switched off or diverted.

Transformers with 333 mV output

Correct measurement is the foundation for smarter station automation. To that end, ELEQ offers a range of transformers with 333 mV output. In addition to our split-core current transformers (TQ), we are developing our smallest transformers, the RM17 and RM27, with a voltage output.

The benefits of our 333 mV range are:

  • Easy to install
    • o The TQ transformers are split-core, which is also perfect for retrofit jobs;
    • o Longer cables possible to the measuring unit.
  • Safe
    • o The transformer does not need to be short-circuited when the meter has to be disassembled.

In short, ELEQ offers the solution for correct measurement to enable smarter station automation, working together with leading international companies to achieve it.

Share this item via

Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Social Image Social Image Social Image

ELEQ Voltage Transformer for decentralised generation

As synergy results in energy we aim for partnerships. One such example is the metering challenges presented by high voltages in decentralised generation. In this case, ELEQ collaborated with wind turbine builders, energy companies and panel builders to develop a line of voltage transformers. The new transformers allow the continued use of standard kWh meters for both the metered voltage and the supply voltage.

Together with our customers we came up with a solution for the challenge. The challenge was:
– High voltages in decentralised generation prevented the use of standard kWh meters.

While working closely together we developed a voltage transformer that allows the use of standard kWh meters for both the voltage to be measured and the supply voltage. This has the following advantages:
– Simplified installation;
– Cost savings;
– The transformers satisfy the standards for metering.

Also looking for Mastering Electricity Together?
Contact us for more information or make an appointment through email [email protected] or by calling us at +31 (0) 521 533 333 or + 49 (0) 2273 988 70.

Spanningstransformator svu

Share this item

Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Social Image Social Image Social Image

16.04.2019

Craftsmanship and expertise

For more than 70 years ELEQ has been offering craftsmanship and expertise in electrotechnical applications. We do not only use this gathered knowledge to work continuously together with customers on new products, innovations and smart solutions, but also by participating in research.

Recently PAC World Magazine published a study where our engineer Douwe Baars contributed to together with ABB. The subject of this study is the influence of an external magnetic field on a ring-core Current Transformer which can, for example, be applied in power transformers or switchgear.

In short the study stated that under certain conditions an external magnetic field is able to saturate the core of a ring core current transformer locally. A significant peak current can be generated by the secondary winding at the instant of switching on an external magnetic field, e.g. due to the asymmetrical inrush current of a power transformer. This undesired peak current might trip the protection system. A winding for flux compensation can prevent this peak current almost completely.

Interested and looking for more information? Contact us through [email protected] or by phone via +31 (0) 521 533 333.

For more information: http://bit.ly/29QObqo

ELEQ, part of a smart world

Application field
Marine & Industry
News & Events
Transport & Distribution

Product category
Bushing
Transformers

Share this item via 

Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Social Image Social Image Social Image

16.04.2019

Energy management systems

ELEQ designs and manufactures solutions for measuring, protecting, and connecting electrical energy. Decentralized generation, technological advances, and the search for sustainable energy mean that measurement and protection will become increasingly important. ISO 50001 contains clear guidelines on achieving structural energy savings.

Government regulations also have a strong influence on responsible use of energy. As of December 2015, large companies (>250 employees or >EUR 50 million turnover) in the Netherlands will be required to conduct an energy audit every four years in order to reach the European goal of a 20% energy reduction by 2020. Large companies in Germany with an effective energy management system will see a portion of their energy tax returned. These measures ensure that more and more of these management systems are put into place.

Because this often takes place in existing situations and the space is often limited, ELEQ has launched a new energy management product line consisting of a number of smart solutions for connecting and measuring electricity using split-core current transformers and sensors, really small current transformers, or a combination of current and voltage. ELEQ has also developed and launched a whole line of fused voltage taps.

In order to stay up to date on the possibilities and challenges involved in setting up a good and safe energy measurement, we have various energy management systems actively running at our branches. This has a number of benefits:

1)      We can measure our own usage and manage accordingly

2)      We can test our own products for usability, ease of installation, and quality

3)      We can fine-tune our product development to better suit the market

These systems will be used to properly respond to innovations and developments in the future.

Application field
Marine & Industry
News & Events
Transport & Distribution

Product category
Bushing
Transformers

Share this item via 

Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Social Image Social Image Social Image

16.04.2019

Even faster the best solution

Beside producer of our end-products, we also produce a large amount of our tools and semi-finished products. To be able to produce our innovative end-products even faster, ELEQ has introduced a 5-axis milling device, the Hermle C 30 UP + PW800 since the start of 2014.

The Hermle can be used for complex mechanical treatments for a large range of metals and plastics. This makes us able to create tools even faster, to produce semi-finished and end-products with. Altogether, due to this equipment, we are capable to produce complex products even faster for our customer. At ELEQ, we never go for the simplest solution, but for the best solution, for you, as our customer.

ELEQ, Part of a Smart World

Application field
Energy Management
Marine & Industry
News & Events
Public Area
Transport & Distribution

Product category
Connection boxes
Energy Management
Measuring equipment
Transformers

Share this item via 

Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Social Image Social Image Social Image

16.04.2019

Solar panels

Besides our reliable, accurate and safe measuring, protecting and connecting of electrical energy, ELEQ now also generates energy!

Since 31 October 2012 we generate electricity through solar panels on our location in Kerpen. In total we have 1084 solar panels with a total surface of 1791 m². With those solar panels we can generate 36% of the required energy we need in Kerpen. In brief, ELEQ not only helps you to become more energy efficient, we also produce our product with more durable energy!

ELEQ, part of a smart world

Application field
Energy Management
Marine & Industry
News & Events
Public Area
Transport & Distribution

Product category
Connection boxes
Energy Management
Measuring equipment
Transformers

Deel dit item via

Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Social Image Social Image Social Image

ELEQ Bushing Transformer for Medium Voltage Switchgears

Smart Grid developments require more measurements in Medium Voltage Switchgears (MV-SG). For example for energy management purposes or revenue metering (billing). In addition, the footprint of Medium Voltage Switchgears needs to be reduced. Hence, these additional measurements may not increase the size of Medium Voltage Switchgears. To meet those requirements ELEQ designed and produced a new Bushing Current Transformer which fits in the existing Medium Voltage Switchgears on a spot which was not used yet.

With one of our customers, who choose ELEQ to meet the market trends described above, we designed a new bushing transformer. Please find below a quote of our customer:

“We see ELEQ as one of the most innovative companies within the area of protection and measurement CTs, which provides us with up to date products, new products and competitive terms and conditions.”

This new bushing transformer, the SBM 106-54-82, is a low voltage current transformer for mounting around the bushing/conus connector in medium voltage switchgears. With this compact transformer additional measurements are possible without increasing the size of the medium voltage switchgear.

Advantages SBM Bushing Transformer

First of all, due to its optimized design the bushing transformer fits around almost all bushing connectors. The window size of the transformer bushing CT is 82 mm. Also the outer dimensions are optimized which makes it suitable to mount the transformer bushing CT between the phases in medium voltage switchgears with its size of 106 mm.

In addition, those compact dimensions decrease the Total Cost of Ownership (TCO). In addition the transformer bushing CT is executed with a click system which secures correct installation and reduces the Total Cost of Ownership.

Additional the bushing transformer is designed to measure accurate at low temperatures. With the new bushing transformer measurements are possible till -35°C.

Furthermore, because of the sealable connectors the bushing CT can be used for revenue metering (billing).

Also, the ELEQ quality assurance system is recognized, according conformity assessment procedure, by the National Metrology Institute of German (PTB). So the SBM current transformer can be used for billing purposes as soon as it is placed on the market. These current transformers can be supplied with a declaration of conformity. This enables ELEQ to declare and confirm that its products meet the basic requirements of the law on measurements and calibration.

In conclusion, if you are looking for more measurements without a footprint expansion for your Medium Voltage Switch-gears, meet our new Bushing Transformer which fits in the existing Medium Voltage Switchgears on a spot which was not used yet.

Share this post via

Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Social Image Social Image Social Image

ELEQ Customized transformer concept for transformer station

The transition from a fossil energy-based central energy system to a sustainable decentralized system requires a lot from the electricity network. Network operator Enexis is taking the next step towards digitization and data-driven asset management by placing sensors in its medium-voltage stations. The data collected here supports the network operator in monitoring his network, in making smart investment decisions and in implementing smart maintenance. This digitization makes it easier for municipalities and private individuals to make their energy consumption more sustainable.

Like any government company, Enexis is obliged to publicly tender its tenders. Because the network company expects to use Distribution Automation (DA) and Distribution Automation Light (Dali) boxes for a long period of time, the Enexis experts paid a lot of attention to make the Dali box future-proof. Kohlmann: “Of course we have accurately described the specifications with regard to functionality. We also opted for an open system that in principle can handle all type of data protocols. The risk of a vendor lock is more present with data communication systems than with most hardware that we use in our networks. Also the dynamics of these types of systems are very different from what we are used to as they age faster. Besides being open, the system is also quite flexible, so that we can easily add new sensors if we need them in the future.”

Current Transformers

One of the contributions to the Dali box came from ourselves. Our account manager Wim van Turennout: “We originally registered for a small but important part of the Dali box: the connection by using current transformers.”

After the contract was allowed to us, we thought we could help Enexis speed up the installation. Van Turennout: “You cannot just switch off a medium voltage station to install a Dali box. The Dali box must be mounted and connected in an operational medium-voltage station. For example, offering phase voltages and currents, but also taking over the control of public lighting and the tariff signal. Considering the amount of cabling, connecting is often a challenge. Apart from the fact that it is difficult to work in the often tight spaces, mistakes are also made quickly during connecting. Our proposal was to use special connectors for the current transformers that indicate which codes should be mounted to which phase. Subsequently, a technician only needs to follow the color codes to ensure a good connection of the current transformers. With this quite simple solution, we save technicians a lot of research work and the number of recovery actions afterwards is reduced.

Easier to assemble

In addition to the current, the voltage must be measured. For voltage measurement we provide a clamp that is easy to clamp onto the rail with the help of an isolated socket wrench which is also safer than an unsecured wire to a terminal strip, thanks to the built-in fuse. We had already developed this voltage measurement clamp for a similar concept. Again, we came up with a solution that simplifies mounting the Dali boxes, making installation a lot faster.

We like to think along with our customers and use the expertise that we build up to make their work more efficient and safer. The energy transition is a very complex exercise that requires the utmost of the knowledge and skills of the energy market. We as supplier can transfer experience from one network operator to another and thus contribute to keeping the electricity network affordable.”

Also looking for a customized transformer concept? Contact us for more information.

Share this item via

Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Continent Image Social Image Social Image Social Image